Follow
John Geraghty
Title
Cited by
Cited by
Year
Genetic algorithm performance with different selection strategies in solving TSP
NM Razali, J Geraghty
Proceedings of the world congress on engineering 2 (1), 1-6, 2011
7632011
Supplier selection paradigm: An integrated hierarchical QFD methodology under multiple-criteria environment
A Bhattacharya, J Geraghty, P Young
Applied Soft Computing 10 (4), 1013-1027, 2010
2962010
A comparison of hybrid push/pull and CONWIP/pull production inventory control policies
J Geraghty, C Heavey
International Journal of Production Economics 91 (1), 75-90, 2004
1182004
A review and comparison of hybrid and pull-type production control strategies
J Geraghty, C Heavey
Stochastic Modeling of Manufacturing Systems: Advances in Design …, 2006
1042006
Design of a resilient shock absorber for disrupted supply chain networks: a shock-dampening fortification framework for mitigating excursion events
A Bhattacharya, J Geraghty, P Young, PJ Byrne
Production Planning & Control 24 (8-9), 721-742, 2013
612013
Supply chain analysis using simulation, Gaussian process modelling and optimisation
W Smew, P Young, J Geraghty
International Journal of Simulation Modelling 12 (3), 178-189, 2013
522013
Evaluation of multi-product lean manufacturing systems with setup and erratic demand
CE Onyeocha, J Khoury, J Geraghty
Computers & Industrial Engineering 87, 465-480, 2015
362015
A comparison of HK-CONWIP and BK-CONWIP control strategies in a multi-product manufacturing system
CE Onyeocha, J Wang, J Khoury, J Geraghty
Operations Research Perspectives 2, 137-149, 2015
352015
Evaluation of production control strategies for negligible‐setup, multi‐product, serial lines with consideration for robustness
OA Olaitan, J Geraghty
Journal of Manufacturing Technology Management 24 (3), 331-357, 2013
292013
A modification of the hybrid Kanban-CONWIP production control strategy for multi-product manufacturing systems
CE Onyeocha, J Geraghty
Proc. of the 29th International Manufacturing Conference (IMC29). University …, 2012
212012
On supporting Lean methodologies using constraint-based scheduling
R van der Krogt, J Geraghty, MR Salman, J Little
Journal of Scheduling 13, 301-314, 2010
202010
A COMPARISON OF KANBAN-LIKE CONTROL STRATEGIES IN A MULTI-PRODUCT MANUFACTURING SYSTEM UNDER ERRATIC DEMAND
CE Onyeocha, J Khoury, J Geraghty
Simulation Conference (WSC), 2013 Winter, 2730-2741, 2013
162013
An investigation of the influence of coefficient of variation in the demand distribution on the performance of several lean production control strategies
J Geraghty, C Heavey
International journal of manufacturing technology and management 20 (1-4 …, 2010
152010
A multi-objective genetic algorithm for extend
B Kernan, J Geraghty
Proceedings of the first Irish workshop on simulation in manufacturing …, 2004
142004
Intelligent self-designing production control strategy: Dynamic allocation hybrid pull-type mechanism applicable to closed-loop supply chains
J Ebner, P Young, J Geraghty
Computers & Industrial Engineering 135, 1127-1144, 2019
132019
On the analytical framework of resilient supply-chain network assessing excursion events
A Bhattacharya, J Geraghty, P Young
2009 Third Asia International Conference on Modelling & Simulation, 392-397, 2009
132009
Sequencing optimisation for makespan improvement at wet-etch tools
A Rotondo, P Young, J Geraghty
Computers & Operations Research 53, 261-274, 2015
122015
Implementing ManPy, a semantic-free open-source discrete event simulation package, in a job shop
O Olaitan, J Geraghty, P Young, G Dagkakis, C Heavey, M Bayer, J Perrin, ...
Procedia CIRP 25, 253-260, 2014
122014
Incorporating sustainable criteria in a dynamic multi-objective recommendation planning tool for a continuous manufacturing process: A dairy case study
C Eccher, J Geraghty
Journal of Manufacturing Systems 55, 159-170, 2020
102020
Robustness analysis of pull strategies in multi-product systems
CE Onyeocha, J Khoury, J Geraghty
Journal of Industrial Engineering and Management (JIEM) 8 (4), 1125-1161, 2015
92015
The system can't perform the operation now. Try again later.
Articles 1–20