Analysis and design of discrete part production lines CT Papadopoulos, MEJ O'Kelly, MJ Vidalis, D Spinellis Springer New York, 2009 | 143 | 2009 |
A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines HT Papadopoulos, MI Vidalis Computers & Industrial Engineering 41 (3), 261-277, 2001 | 86 | 2001 |
Minimizing WIP inventory in reliable production lines HT Papadopoulos, MI Vidalis International Journal of Production Economics 70 (2), 185-197, 2001 | 82 | 2001 |
Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines AC Diamantidis, CT Papadopoulos, MI Vidalis International journal of production research 42 (4), 651-675, 2004 | 53 | 2004 |
On the workload and ‘phaseload’allocation problems of short reliable production lines with finite buffers MI Vidalis, CT Papadopoulos, C Heavey Computers & Industrial Engineering 48 (4), 825-837, 2005 | 34 | 2005 |
Optimal buffer allocation in short μ-balanced unreliable production lines HT Papadopoulos, MI Vidalis Computers & Industrial Engineering 37 (4), 691-710, 1999 | 31 | 1999 |
Optimal buffer storage allocation in balanced reliable production lines HT Papadopoulos, MI Vidalis International Transactions in Operational Research 5 (4), 325-339, 1998 | 30 | 1998 |
Markovian analysis of production lines with Coxian-2 service times MI Vidalis, HT Papadopoulos International Transactions in Operational Research 6 (5), 495-524, 1999 | 21 | 1999 |
A recursive algorithm for generating the transition matrices of multistation multiserver exponential reliable queueing networks MI Vidalis, HT Papadopoulos Computers & Operations Research 28 (9), 853-883, 2001 | 19 | 2001 |
Performance evaluation of a two‐echelon supply chain with stochastic demand, lost sales, and Coxian‐2 phase replenishment times M Vidalis, V Vrisagotis, G Varlas International Transactions in Operational Research 21 (4), 649-671, 2014 | 17 | 2014 |
Performance evaluation of a merge supply network: A distribution centre with multiple reliable random suppliers MI Vidalis, G Michael Computers & Industrial Engineering 70, 43-58, 2014 | 13 | 2014 |
Performance evaluation of a push–pull merge system with multiple suppliers, an intermediate buffer and a distribution centre with parallel machines/channels AC Diamantidis, SI Koukoumialos, MI Vidalis International Journal of Production Research 54 (9), 2628-2652, 2016 | 10 | 2016 |
Markovian analysis of a push-pull merge system with two suppliers, an intermediate buffer, and two retailers A Diamantidis, S Koukoumialos, M Vidalis International Journal of Operations Research and Information Systems (IJORIS …, 2017 | 9 | 2017 |
The buffer allocation problem CT Papadopoulos, MJ Vidalis, MEJ O’Kelly, D Spinellis Springer Optimization and Its Applications, 131-159, 2009 | 8 | 2009 |
A heuristic algorithm for buffer allocation in unreliable production lines GA Vouros, MI Vidalis, HT Papadopoulos International Journal of Operations and Quantitative Management 6 (1), 23-43, 2000 | 8 | 2000 |
Performance evaluation of a merge supply network: a production centre with multiple different reliable suppliers MI Vidalis, S Koukoumialos, A Diamantidis, G Blanas 10th Conference on Stochastic models of manufacturing and service operations …, 2015 | 5 | 2015 |
Optimal inventory control policies of a two-stage push–pull production inventory system with lost sales under stochastic production, transportation, and external demand G Varlas, M Vidalis, S Koukoumialos, A Diamantidis Top 29, 799-832, 2021 | 4 | 2021 |
Base-stock policies for two and three stages serial inventory systems with stochastic demand and replenishments DD Ntio, MJ Vidalis Operations and Supply Chain Management: An International Journal 4 (2), 78-84, 2014 | 4 | 2014 |
Performance evaluation of a merge supply system with a distribution centre, two reliable suppliers, one buffer and Erlang lead times S Koukoumialos, D Ntio, G Varlas International Journal of Business Science & Applied Management (IJBSAM) 7 (3 …, 2012 | 4 | 2012 |
On the workload allocation problem of short unreliable production lines with finite buffers MI Vidalis, C Heavey Proc. 4th Aegean Int. Conf. Analysis of Manufacturing Systems, 1158-1162, 2003 | 3 | 2003 |