Follow
Tariq S. Abdul-Razaq
Tariq S. Abdul-Razaq
Prof. Mathematics Dept. College of Science, Univ. of Al-Mustansiriyah
Verified email at uomustansiriyah.edu.iq
Title
Cited by
Cited by
Year
A survey of algorithms for the single machine total weighted tardiness scheduling problem
TS Abdul-Razaq, CN Potts, LN Van Wassenhove
Discrete Applied Mathematics 26 (2-3), 235-253, 1990
2881990
Dynamic programming state-space relaxation for single-machine scheduling
TS Abdul-Razaq, CN Potts
Journal of the Operational Research Society 39 (2), 141-152, 1988
2471988
A survey for the Single-Machine Scheduling Total WT Scheduling Problem
TS Abdul-Razaq, CN Potts, LN Van Wassenhove
Discrete Applied Mathematics 26, 235-253, 1990
101990
Algorithms for Scheduling a Single Machine to Minimize Total Completion Time and Total Tardiness.
TS Abdul-Razaq, FH Ali
Basrah Journal of Science/Magallat Al-Barat Li-L-ulum 34, 2016
92016
Local search algorithms for multi-criteria single machine scheduling problem
TS Abdul-Razaq, AO Akram
Ibn AL-Haitham Journal For Pure and Applied Science, 436-451, 2018
62018
Constructing of an Artificial Neural Networks to Minimize Total Completion Time and Total Tardiness
TS Abdul-Razaq, FH Ali
IOSR Journal of Mathematics (IOSR-JM) e-ISSN, 2278-3008, 2014
62014
Solving Composite Multi objective Single Machine Scheduling Problem Using Branch and Bound and Local Search Algorithms
TS Abdul-Razaq, HM Motair
Al-Mustansiriyah Journal of Science 28 (3), 200-208, 2017
52017
Hybrid bees algorithm to solve aircraft landing problem
T Abdul-Razaq, F Ali
Journal of Zankoy Sulaimani-Part A 17 (1), 71-90, 2015
52015
Machine scheduling problems: a branch and bound approach
TS Abdul-Razaq
51987
Exact and approximation approaches for solving multiple objective function
TS Abdul-Razaq
Al-Mustansiriyah Journal of Science 27 (3), 2016
42016
Near optimal solution of scheduling problems using heuristic methods
TS Abdul-Razaq
J. of Basrah university, 87-104, 1993
41993
Minimizing the Total Completion Times, the Total Tardiness and the Maximum Tardiness
TS Abdul-Razaq, ZM Ali
Ibn AL-Haitham Journal For Pure and Applied Science 28 (2), 155-170, 2017
32017
Algorithms for multicriteria scheduling problems
ST ABDUL-RAZAQ, FK ABDUL-RAZAQ
basrah journal of science 34 (3), 1-12, 2016
32016
Single Machine Scheduling to Minimize A Function of Square Completion Time and Maximum Earliness Simultaneously
TS Abdul-Razaq
Journal of Al-Qadisiyah for computer science and mathematics 2 (1), 79-95, 2010
32010
A new algorithm for optimality
AM Ramadhan, TS Abdul-Razaq
KAJ) 1A, 75-78, 2001
32001
Combinatorial optimization problems: modeling and solving
FH Ali, TS Abdul-Razaq
LAP LAMBERT Academic Publishing, 2016
22016
Modified Heuristics for Scheduling in Flow Shop to Minimize Makespan
T Abdul-Razaq, H Chachan, F Ali
Journal of Al-Rafidain University College For Sciences (Print ISSN: 1681 …, 2012
22012
Local Search Heuristic for Single Machine Scheduling with Batching to Minimize the Multi Objective Function
TS Abdul-Razaq, HF Abdullah
Al-Mustansiriyah Journal of Science 21 (7), 2010
22010
Solving Four Cost Multi-Objective Scheduling Problem Simultaneously
TS Abdul–Razaq, HM Motair
journal of kerbala university 16 (1), 2018
12018
On the Two Machine Permutation Flowshop Scheduling Problems Using Variable Neighborhood Search Algorithms
TS Abdul–Razaq, HM Motair
Almuthanna J. Pure Sci. 5 (1), 2018
12018
The system can't perform the operation now. Try again later.
Articles 1–20