Follow
Christian Schranz
Christian Schranz
Centre for Digital Building Processes, TU Wien
Verified email at tuwien.ac.at - Homepage
Title
Cited by
Cited by
Year
Conversion from imperfection-sensitive into imperfection-insensitive elastic structures I: Theory
HA Mang, C Schranz, P Mackenzie-Helnwein
Computer Methods in Applied Mechanics and Engineering 195 (13-16), 1422-1457, 2006
512006
Conversion from imperfection-sensitive into imperfection-insensitive elastic structures. II: Numerical investigation
C Schranz, B Krenn, HA Mang
Computer methods in applied mechanics and engineering 195 (13-16), 1458-1479, 2006
432006
Digital twins in the construction industry: a perspective of practitioners and building authority
A Ammar, H Nassereddine, N AbdulBaky, A AbouKansour, J Tannoury, ...
Frontiers in Built Environment 8, 834671, 2022
412022
Potentials of Augmented Reality in a BIM based building submission process.
C Schranz, H Urban, A Gerger
Journal of Information Technology in Construction 26, 2021
372021
Integrating construction 4.0 technologies: A four-layer implementation plan
M El Jazzar, C Schranz, H Urban, H Nassereddine
Frontiers in Built Environment 7, 671408, 2021
332021
Construction 4.0: a roadmap to shaping the future of construction
M El Jazzar, H Urban, C Schranz, H Nassereddine
ISARC. Proceedings of the international symposium on automation and robotics …, 2020
322020
A comprehensive map for integrating augmented reality during the construction phase
H Nassereddine, C Schranz, M Bou Hatoum, H Urban
Creative Construction e-Conference 2020, 56-64, 2020
212020
Propositions for a resilient, post-COVID-19 future for the AEC industry
H Nassereddine, KW Seo, ZK Rybkowski, C Schranz, H Urban
Frontiers in built environment 7, 687021, 2021
192021
Augmented reality in AEC education: a case study
H Urban, G Pelikan, C Schranz
Buildings 12 (4), 391, 2022
182022
Fracture-mechanical properties of mortar-to-brick interfaces
A Schneemayer, C Schranz, A Kolbitsch, EK Tschegg
Journal of materials in civil engineering 26 (9), 04014060, 2014
182014
Entwicklung eines openBIM-Bewilligungsverfahrens
T Krischmann, H Urban, C Schranz
Bauingenieur 95 (9), 335-344, 2020
102020
Folded plate structures made of glass laminates: a proposal for the structural assessment
S Marinitsch, C Schranz, M Teich
Glass Structures & Engineering 1 (2), 451-460, 2016
102016
Augmented Reality im Bauwesen: Teil 1—Anwendungs-und Anforderungsanalyse
C Schranz, A Gerger, H Urban
Bauingenieur 95 (10), 379-388, 2020
82020
BIM auf Baustellen mit Augmented Reality
H Urban, C Schranz, A Gerger
bauaktuell 10 (5), 192-196, 2019
72019
Mapping the capabilities and benefits of AR construction use-cases: A comprehensive map
H Nassereddine, C Schranz, M Bou Hatoum, H Urban
Organization, technology & management in construction: an international …, 2022
62022
A finite-element-based approach to quantify the impact of bed joint reinforcement on the compressive strength of vertically perforated clay block masonry
R Suda, T Kiefer, C Schranz, J Füssl
Engineering Structures 239, 112277, 2021
62021
Augmented Reality im Bauwesen: Teil 2—Baustellentaugliches Trackingsystem
H Urban, T Irschik, C Schranz, C Schönauer
Bauingenieur 95 (12), 501-508, 2020
52020
Faltwerke aus Glas
S Marinitsch, C Schranz, M Teich
Stahlbau 84 (S1), 201-211, 2015
52015
BIMcert Handbuch: Grundlagenwissen openBIM
CC Eichler, C Schranz, T Krischmann, H Urban, M Hopferwieser, ...
Mironde-Verlag, 2024
42024
Augmented Reality for Building Authorities: A Use Case Study in Austria
A Gerger, H Urban, C Schranz
Buildings 13 (6), 1462, 2023
42023
The system can't perform the operation now. Try again later.
Articles 1–20