Follow
Faris Elghaish, PhD, MCIOB, FHEA
Faris Elghaish, PhD, MCIOB, FHEA
Verified email at qub.ac.uk - Homepage
Title
Cited by
Cited by
Year
Integrated project delivery with blockchain: An automated financial system
F Elghaish, S Abrishami, MR Hosseini
Automation in construction 114, 103182, 2020
2182020
Toward digitalization in the construction industry with immersive and drones technologies: a critical literature review
F Elghaish, S Matarneh, S Talebi, M Kagioglou, MR Hosseini, ...
Smart and Sustainable Built Environment 10 (3), 345-363, 2021
1252021
Blockchain and the ‘Internet of Things' for the construction industry: research trends and opportunities
F Elghaish, MR Hosseini, S Matarneh, S Talebi, S Wu, I Martek, ...
Automation in construction 132, 103942, 2021
1032021
Integrated project delivery with BIM: An automated EVM-based approach
F Elghaish, S Abrishami, MR Hosseini, S Abu-Samra, M Gaterell
Automation in Construction 106, 102907, 2019
742019
Cash flow system development framework within integrated project delivery (IPD) using BIM tools
F Elghaish, S Abrishami, S Abu Samra, M Gaterell, MR Hosseini, R Wise
International Journal of Construction Management 21 (6), 555-570, 2021
682021
Revolutionising cost structure for integrated project delivery: a BIM-based solution
F Elghaish, S Abrishami, MR Hosseini, S Abu-Samra
Engineering, construction and architectural management 28 (4), 1214-1240, 2021
592021
Applications of Industry 4.0 digital technologies towards a construction circular economy: gap analysis and conceptual framework
F Elghaish, ST Matarneh, DJ Edwards, FP Rahimian, H El-Gohary, ...
Construction Innovation 22 (3), 647-670, 2022
522022
Developing a framework to revolutionise the 4D BIM process: IPD-based solution
F Elghaish, S Abrishami
Construction Innovation 20 (3), 401-420, 2020
522020
Digitalised circular construction supply chain: An integrated BIM-Blockchain solution
F Elghaish, MR Hosseini, T Kocaturk, M Arashpour, MB Ledari
Automation in Construction 148, 104746, 2023
462023
Financial management of construction projects: Hyperledger fabric and chaincode solutions
F Elghaish, FP Rahimian, MR Hosseini, D Edwards, M Shelbourn
Automation in Construction 137, 104185, 2022
402022
Digital twin with Machine learning for predictive monitoring of CO2 equivalent from existing buildings
A Arsiwala, F Elghaish, M Zoher
Energy and Buildings 284, 112851, 2023
372023
Developing a new deep learning CNN model to detect and classify highway cracks
F Elghaish, S Talebi, E Abdellatef, ST Matarneh, MR Hosseini, S Wu, ...
Journal of Engineering, Design and Technology 20 (4), 993-1014, 2022
352022
Industry 4.0 solutions for building design and construction: a paradigm of new opportunities
FP Rahimian, JS Goulding, S Abrishami, S Seyedzadeh, F Elghaish
Routledge, 2021
342021
A centralised cost management system: exploiting EVM and ABC within IPD
F Elghaish, S Abrishami
Engineering, Construction and Architectural Management 28 (2), 549-569, 2021
332021
Artificial intelligence-based voice assistant for BIM data management
F Elghaish, JK Chauhan, S Matarneh, FP Rahimian, MR Hosseini
Automation in Construction 140, 104320, 2022
252022
Toward digital construction supply chain-based Industry 4.0 solutions: scientometric-thematic analysis
L Gharaibeh, KM Eriksson, B Lantz, S Matarneh, F Elghaish
Smart and Sustainable Built Environment 13 (1), 42-62, 2024
232024
Automated and interconnected facility management system: An open IFC cloud-based BIM solution
S Matarneh, F Elghaish, FP Rahimian, N Dawood, D Edwards
Automation in Construction 143, 104569, 2022
222022
Game-like interactive environment using BIM-based virtual reality for the timber frame self-build housing sector
L Potseluyko, FP Rahimian, N Dawood, F Elghaish, A Hajirasouli
Automation in Construction 142, 104496, 2022
222022
Deep learning for detecting distresses in buildings and pavements: a critical gap analysis
F Elghaish, ST Matarneh, S Talebi, S Abu-Samra, G Salimi, C Rausch
Construction Innovation 22 (3), 554-579, 2022
222022
Revolutionising AEC financial system within project delivery stages: A permissioned blockchain digitalised framework
S Abrishami, F Elghaish
36th CIB W 78, 2019, 2019
202019
The system can't perform the operation now. Try again later.
Articles 1–20