Follow
Professor Nashwan Dawood
Professor Nashwan Dawood
Associate Dean, School of Science, Engineering and Design , Teesside University
Verified email at tees.ac.uk - Homepage
Title
Cited by
Cited by
Year
BIM in facilities management applications: a case study of a large university complex
M Kassem, G Kelly, N Dawood, M Serginson, S Lockley
Built Environment Project and Asset Management, 2015
3082015
On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning
FP Rahimian, S Seyedzadeh, S Oliver, S Rodriguez, N Dawood
Automation in Construction 110, 103012, 2020
1592020
Construction workspace planning: assignment and analysis utilizing 4D visualization technologies
N Dawood, Z Mallasi
Computer‐Aided Civil and Infrastructure Engineering 21 (7), 498-513, 2006
1442006
BIM for facilities management: Evaluating BIM standards in asset register creation and service life planning
J Patacas, N Dawood, V Vukovic, M Kassem
Journal of Information Technology in Construction 20 (10), 313-318, 2015
1432015
BIM for facility management: a review and a case study investigating the value and challenges
G Kelly, M Serginson, S Lockley, N Dawood, M Kassem
Proceedings of the 13th International Conference on Construction …, 2013
1402013
Development of automated communication of system for managing site information using internet technology
N Dawood, A Akinsola, B Hobbs
Automation in construction 11 (5), 557-572, 2002
1392002
Development of workspace conflict visualization system using 4D object of work schedule
HS Moon, N Dawood, LS Kang
Advanced Engineering Informatics 28 (1), 50-65, 2014
1352014
Estimating project and activity duration: a risk management approach using network analysis
N Dawood
Construction Management & Economics 16 (1), 41-48, 1998
1351998
Development of an integrated information resource base for 4D/VR construction processes simulation
N Dawood, E Sriprasert, Z Mallasi, B Hobbs
Automation in construction 12 (2), 123-131, 2003
1342003
Construction workspace management: the development and application of a novel nD planning approach and tool
R Chavada, N Dawood, M Kassem
Journal of Information Technology in Construction 17, 213-236, 2012
1182012
Building information modelling: protocols for collaborative design processes
M Kassem, N Iqbal, G Kelly, S Lockley, N Dawood
Journal of Information Technology in Construction 19, 126-149, 2014
982014
A wireless sensor network for intelligent building energy management based on multi communication standards-A case study
H Grindvoll, O Vermesan, T Crosbie, R Bahr, N Dawood, GM Revel
Journal of Information technology in construction 17, 43-61, 2012
922012
BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption
M Kassem, T Brogden, N Dawood
Journal of Construction Engineering and Project Management 2 (4), 1-10, 2012
822012
Intelligence approach to production planning system for bespoke precast concrete products
V Benjaoran, N Dawood
Automation in construction 15 (6), 737-745, 2006
812006
A proposed approach to comparing the BIM maturity of countries
M Kassem, B Succar, N Dawood
30th International Conference on Applications of IT in the AEC Industry, 2013
802013
Comparative study of delay factors in Libyan and the UK construction industry
A Shebob, N Dawood, RK Shah, Q Xu
Engineering, Construction and Architectural Management, 2012
792012
The virtual construction site (VIRCON) tools: An industrial evaluation
N Dawood, D Scott, E Sriprasert, Z Mallasi
Journal of Information Technology in Construction 10, 43-54, 2005
782005
Multi-constraint information management and visualisation for collaborative planning and control in construction
E Sriprasert, N Dawood
Journal of Information Technology in Construction 8, 341-366, 2003
772003
Development of 4D based performance indicators in construction industry
N Dawood, S Sikka
Engineering, Construction and Architectural Management, 2009
742009
Construction workspace management within an Industry Foundation Class-Compliant 4D tool
M Kassem, N Dawood, R Chavada
Automation in construction 52, 42-58, 2015
732015
The system can't perform the operation now. Try again later.
Articles 1–20