Follow
Timson Yeung
Timson Yeung
PhD. Candidate - Technion - IIT
Verified email at campus.technion.ac.il
Title
Cited by
Cited by
Year
Exploring graph neural networks for semantic enrichment: Room type classification
Z Wang, R Sacks, T Yeung
Automation in Construction 134, 104039, 2022
682022
Room type classification for semantic enrichment of building information modeling using graph neural networks
Z Wang, T Yeung, R Sacks, Z Su
Proc. of the Conference CIB W78 2021, 11-15, 2021
112021
A comprehensive data schema for digital twin construction
J Schlenger, T Yeung, S Vilgertshofer, J Martinez, R Sacks, A Borrmann
Proceedings of the 29th EG-ICE International Workshop on Intelligent …, 2022
102022
Situational awareness in construction using a serious game
JG Martinez, T Yeung, R Sacks, Y Shahaf, LO Sharoni
Journal of Construction Engineering and Management 149 (3), 04022183, 2023
72023
The role of simulation in digital twin construction
T Yeung, JR Martinez, L Sharoni, R Sacks
Proceedings of the 29th EG-ICE international workshop on intelligent …, 2022
42022
Production planners’ scope of action in the context of digital twin construction
JG Martinez, T Yeung, R Sacks
Twelth International Conference Construction 21stCentury, 2022
22022
Automatic Parametric Generation of Simulation Models from Project Information in Digital Twin Construction
T Yeung, J Martinez, LO Sharoni, J Leao, R Sacks
International Conference on Computing in Civil and Building Engineering, 633-650, 2022
12022
System Design–Requirements and Specifications for Simulation and Prediction
R Sacks, T Yeung, J Martinez
BIM2TWIN 500, 7.1, 2020
12020
A concurrent design paradigm for interdisciplinary design collaboration: insights from focus group study
S Chen, T Yeung, E Pilke, R Sacks, K Nyberg
EC3 Conference 2023 4, 0-0, 2023
2023
Reference Architecture and Ontology Framework for Digital Twin Construction
JU Schlenger, K Pluta, A Mathew, T Yeung, R Sacks, A Borrmann
Available at SSRN 4887436, 0
THE PICO FRAMEWORK FOR ANALYSIS AND DESIGN OF PRODUCTION SYSTEMS FOR CONSTRUCTION
LO Sharoni, R Sacks, T Yeung, O Alhava, E Laine, JM Ribon
PREDICTIVE SIMULATION FOR AUTOMATED DECISION-SUPPORT IN PRODUCTION PLANNING AND CONTROL
T Yeung, JGM Ribón, LO Sharoni, R Sacks, T Pitkäranta
The system can't perform the operation now. Try again later.
Articles 1–12