Follow
M. Reza Hosseini
M. Reza Hosseini
Verified email at unimelb.edu.au
Title
Cited by
Cited by
Year
Critical evaluation of off-site construction research: A Scientometric analysis
MR Hosseini, I Martek, EK Zavadskas, AA Aibinu, M Arashpour, ...
Automation in construction 87, 235-247, 2018
5172018
Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries
S Banihashemi, MR Hosseini, H Golizadeh, S Sankaran
International journal of project management 35 (6), 1103-1119, 2017
4942017
Artificial intelligence in the AEC industry: Scientometric analysis and visualization of research activities
A Darko, APC Chan, MA Adabre, DJ Edwards, MR Hosseini, EE Ameyaw
Automation in construction 112, 103081, 2020
4072020
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
M Oraee, MR Hosseini, E Papadonikolaki, R Palliyaguru, M Arashpour
International journal of project management 35 (7), 1288-1301, 2017
4062017
Collaboration barriers in BIM-based construction networks: A conceptual model
M Oraee, MR Hosseini, DJ Edwards, H Li, E Papadonikolaki, D Cao
International Journal of Project Management 37 (6), 839-854, 2019
2452019
A survey of the factors affecting the productivity of construction projects in Iran
P Ghoddousi, MR Hosseini
Technological and economic development of economy 18 (1), 99-116, 2012
2452012
Integrated project delivery with blockchain: An automated financial system
F Elghaish, S Abrishami, MR Hosseini
Automation in construction 114, 103182, 2020
2132020
BIM adoption within Australian Small and Medium-sized Enterprises (SMEs): an innovation diffusion model
MR Hosseini, S Banihashemi, N Chileshe, MO Namzadi, C Udaeja, ...
Construction Economics and Building 16 (3), 71-86, 2016
2082016
Combination of dispersive liquid–liquid microextraction with flame atomic absorption spectrometry using microsample introduction for determination of lead in water samples
MT Naseri, P Hemmatkhah, MRM Hosseini, Y Assadi
Analytica chimica acta 610 (1), 135-141, 2008
2052008
A review on renewable energy transition in Australia: An updated depiction
HX Li, DJ Edwards, MR Hosseini, GP Costin
Journal of cleaner production 242, 118475, 2020
1882020
Causes of delays on construction projects: a comprehensive list
S Durdyev, MR Hosseini
International journal of managing projects in business 13 (1), 20-46, 2020
1872020
Patterns and trends in Internet of Things (IoT) research: future applications in the construction industry
A Ghosh, DJ Edwards, MR Hosseini
Engineering, Construction and Architectural Management 28 (2), 457-481, 2021
1722021
Reverse logistics in the construction industry
MR Hosseini, R Rameezdeen, N Chileshe, S Lehmann
Waste Management & Research 33 (6), 499-514, 2015
1562015
Rebar corrosion detection, protection, and rehabilitation of reinforced concrete structures in coastal environments: A review
A James, E Bazarchi, AA Chiniforush, PP Aghdam, MR Hosseini, ...
Construction and Building Materials 224, 1026-1039, 2019
1532019
Analysis of citation networks in building information modeling research
MR Hosseini, M Maghrebi, A Akbarnezhad, I Martek, M Arashpour
Journal of construction engineering and management 144 (8), 04018064, 2018
1492018
Factors driving the implementation of reverse logistics: A quantified model for the construction industry
N Chileshe, R Rameezdeen, MR Hosseini, I Martek, HX Li, ...
Waste management 79, 48-57, 2018
1432018
Drivers for adopting reverse logistics in the construction industry: a qualitative study
N Chileshe, R Rameezdeen, MR Hosseini
Engineering, Construction and Architectural Management 23 (2), 134-157, 2016
1362016
Barriers to implementing reverse logistics in South Australian construction organisations
N Chileshe, R Rameezdeen, MR Hosseini, S Lehmann
Supply chain management: an international journal 20 (2), 179-204, 2015
1362015
Integration of parametric design into modular coordination: A construction waste reduction workflow
S Banihashemi, A Tabadkani, MR Hosseini
Automation in Construction 88, 1-12, 2018
1322018
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini
International Journal of Project Management 34 (7), 1393-1402, 2016
1312016
The system can't perform the operation now. Try again later.
Articles 1–20